kelvin61942434 Profile Banner
kelvin Profile
kelvin

@kelvin61942434

Followers
352
Following
383
Statuses
847

BS in Computer engineering, currently a M.S student in ML/simplified Chinese and English/he, him/中英文均可

Los Angeles, CA
Joined November 2019
Don't wanna be here? Send us removal request.
@kelvin61942434
kelvin
2 days
@Skyrocket71 @planet4589 Because there are two type of platforms in GW constellation. Apparently 8A launched the smaller one this time. Official description: 卫星互联网低轨卫星研制团队实施了共用平台设计,根据每颗卫星的功能及规模差异,设计了大、小两个平台,切换自如、无缝衔接.
0
0
2
@kelvin61942434
kelvin
4 days
@TAbusnardo @raz_liu Naming is a bit like CZ-12 and CZ-12A. From the names HOS reported to local gov, HOS-1 and 2 are sea launch platforms, HOS-3 is a recovery boat.(for now)
0
0
3
@kelvin61942434
kelvin
4 days
Updates on launch infrastructures: 1. CZ-10 VABs is now above the ground level. CZ-5 MLP is in 5B config 2. CZ10 service tower; 2 new MLPs for CZ-5, and CZ7,8 3. Haiyang is constructing a sea launch platform capable of launching CZ-12A or heavier LVs 4. PR-2 TEL is under testing
Tweet media one
Tweet media two
Tweet media three
Tweet media four
1
8
24
@kelvin61942434
kelvin
7 days
@duandang This is a CZ-8A launch. There will be a lot similar launch trajectory in the future. ex: check the trajectory vs CZ-12 debut launch.
0
2
8
@kelvin61942434
kelvin
8 days
@PambaRed @PhazzeeYeehaw When Landspace is able to build and mass produce TQ-12B. We have zero updates on TQ-12B yet, and heard some negative rumors on TQ-12A performance from ZQ-2E debut flight, which causing delays of ZQ-2E Y2.
0
0
1
@kelvin61942434
kelvin
18 days
@GrumpyG53751044 @raz_liu Also, compare this rendering with the latest Sentinel-2 image of the launch complex labeled LC-140.
0
0
0
@kelvin61942434
kelvin
18 days
@GrumpyG53751044 @raz_liu Don’t you think the ZK-2 might be too wide (3*3.35m) for the HIF in the 1st pic?
1
0
0
@kelvin61942434
kelvin
18 days
@GrumpyG53751044 @raz_liu That is 100% TL-3 launch complex. We have multiple ground footage confirmation.
1
0
0
@kelvin61942434
kelvin
22 days
@GrumpyG53751044 Yes, from the length of the transport erector, it looks like TE only transports the 1st stage and interstage section. The crane will stack the 2nd stage and payload fairing on the pad.
0
0
0
@kelvin61942434
kelvin
1 month
@KVP424 The Oriental Maritime Space Port (OMSP) showcased a model of the purposed launch platform in 2023
Tweet media one
Tweet media two
0
0
1
@kelvin61942434
kelvin
1 month
@ShuttleAlmanac @raz_liu VTVL test vehicle only.
0
0
1
@kelvin61942434
kelvin
1 month
@TAbusnardo @Cosmic_Penguin The 75 km hopper is the same one that performed the previous 10 km hop, with some modifications.
0
0
0
@kelvin61942434
kelvin
1 month
@hentailamb @raz_liu lj-2如果真要拖26年不如直接换102R或者自研的力擎2号得了….
0
0
1
@kelvin61942434
kelvin
2 months
@Eee1234171 @Rational314159 星网,千��是标准8用的4.2m整流罩
0
0
2
@kelvin61942434
kelvin
2 months
@Rational314159 为什么能这么丑😅
0
0
2
@kelvin61942434
kelvin
2 months
Rumors and my guesses: CZ-12A: 3.8m diameter, 7*gas-generator methalox engines(Longyun-70 or possibly YF-209 in the future), sea launch/recovery capability. CZ-12B: >4m diameter, 9*gas-generator kerosene engines with (likely) 9*1090kN take-off thrust.
1
0
1
@kelvin61942434
kelvin
2 months
@WLR_2678 感觉东郊椰林这地方其实未来可以发展一下配套旅游,一边是发射区可以观摩发射,另一边未来商业航天码头建成后说不定也能看到刚回收的火箭吊装
Tweet media one
0
0
2