IDOTDistrict4 Profile Banner
IDOT District 4 Profile
IDOT District 4

@IDOTDistrict4

Followers
2K
Following
265
Statuses
4K

Serving Mercer, Warren, Henderson, McDonough, Knox, Fulton, Stark, Peoria, Putnam, Marshall, Woodford & Tazewell counties. https://t.co/fwSSTCug86

Joined October 2013
Don't wanna be here? Send us removal request.
@IDOTDistrict4
IDOT District 4
9 months
⚠️Spot a pothole, have a question or need to report an issue on a state highway or interstate? Click here:
Tweet media one
1
0
0
@IDOTDistrict4
IDOT District 4
17 days
RT @IDOT_Illinois: It's that time of year again, Illinois! Our annual report showcases our work and progress throughout 2024. To access the…
0
2
0
@IDOTDistrict4
IDOT District 4
17 days
RT @IDOT_Illinois: Demolition of the old McClugage Bridge is underway! Crews are removing steel railings, the first section of the deck and…
0
1
0
@IDOTDistrict4
IDOT District 4
18 days
On 2/3, the left lane of WB U.S. 150 will close just before the McClugage Bridge. The closure is necessary as demolition of the old EB bridge occurs and should last for 2 weeks, followed by intermittent daytime lane closures, until demolition is complete.
0
0
1
@IDOTDistrict4
IDOT District 4
2 months
We’re opening lanes and shoulders TOMORROW, Dec. 19 on the new eastbound McClugage Bridge! But the best is yet to come. Stick with us in 2025 as we finish creating a safer, faster, and stronger McClugage Bridge!
0
1
1
@IDOTDistrict4
IDOT District 4
2 months
Exciting news, Washington! The newly constructed intersection of U.S. 24 and Nofsinger Road will open on Dec. 18. Traffic signals to control this intersection will also be fully activated.
0
1
2
@IDOTDistrict4
IDOT District 4
2 months
On 12/12, 10 pm, EB U.S. 150 traffic will be stopped on the McClugage Bridge for up to 20-minute durations for sign installation. Work should complete by 6 am 12/13. On 12/10-11, WB lane closures will occur on U.S. 150 in East Peoria for guardrail work.
0
0
0
@IDOTDistrict4
IDOT District 4
2 months
Northbound I-39 between IL-17/Wenona (exit 35) and IL-18/Streator (exit 41) will close at 7 a.m. Dec. 9. The closure is necessary for emergency pavement patching and is expected to last until the following morning. A detour utilizing IL-251 will be posted.
0
0
0
@IDOTDistrict4
IDOT District 4
2 months
Join us tomorrow, DEC. 4 from 4-6 pm, for a public hearing about proposed improvements to IL-29 from U.S. 150 in Peoria Heights to Gardner Lane in Peoria. It will be held at Peoria Heights Grade School - 500 E. Glen Ave., Peoria Heights.
0
0
0
@IDOTDistrict4
IDOT District 4
2 months
RT @IDOT_Illinois: Join us on Dec. 4 for an open house public hearing to discuss the proposed improvements to Illinois 29 (Galena Road) fro…
0
2
0
@IDOTDistrict4
IDOT District 4
3 months
An open house public hearing for proposed improvements to IL-29 (Galena Road) from the McClugage Bridge (U.S. 150) in Peoria Heights to Gardner Lane in Peoria will be held Dec. 4, 4-6 p.m. at Peoria Heights Grade School - 500 E. Glen Ave., Peoria Heights.
Tweet media one
0
0
1
@IDOTDistrict4
IDOT District 4
3 months
The left lane of WB U.S. 150 (War Memorial Drive) as it approaches the McClugage Bridge in East Peoria will close Nov. 12. The closure is necessary for ongoing construction on the new eastbound McClugage Bridge and is expected to last about a month.
0
0
1
@IDOTDistrict4
IDOT District 4
3 months
Starting 11/10, EB U.S. 150 traffic will be shifted to the right lane as it approaches the McClugage Bridge in Peoria. The lane shift is necessary for pavement replacement in the left lane and this traffic pattern is expected to last for about one month.
0
0
0
@IDOTDistrict4
IDOT District 4
4 months
As needed, 10-15 minute closures on the IL-17/91 bridge over the Spoon River near Wyoming start MON., 10/28. Delays will be from 7-10 am on MON./WED./FRI. of next week and on 11/4 for delivery of large steel beams to the site.
0
0
0
@IDOTDistrict4
IDOT District 4
4 months
In-person hiring events: - 10/23, 4 - 6pm, Aledo Yard, 1610 SE 3rd St, Aledo – 10/24, 4 - 6pm, Biggsville Yard, 1470 State Hwy 94 Biggsville – 10/28, 4 - 6pm, Wenona Yard 3095 County Rd 800 N. Wenona – 10/29, 4 - 6pm, Peoria West Yard 6500 W. Hwy 150, Edwards
Tweet media one
0
0
0
@IDOTDistrict4
IDOT District 4
4 months
Washington Rd (IL- 8/Business U.S. 24) between Legion Rd and Zinser Pl resurfacing in Washington begins 10/21. Traffic will be reduced to one lane with resurfacing completed by the end of Nov. Sidewalk & traffic signal upgrades will wrap up next spring.
0
0
0
@IDOTDistrict4
IDOT District 4
4 months
I- 474 night closures at Airport Rd : - 10/21: EB I-474 closes at 10 pm - 5 am. - 10/22: EB I-474 closes at 10 pm - 5:30 am. - 10/23: WB I-474 closes at 10 pm - 5:30 am. - I-474 on-ramp from Airport Rd closes at 9 pm; off-ramp remains open.
0
1
0
@IDOTDistrict4
IDOT District 4
4 months
MON. (10/14) EB Cedar to Edmund St. and Edmund to WB Cedar ramps will close for milling, paving & guardrail work through 10/31. WB Cedar to Edmund and Edmund to EB Cedar ramps will remain closed until end of Nov. WED. (10/16) the WB lane of Cedar...MORE
1
0
0
@IDOTDistrict4
IDOT District 4
4 months
IDOT announced that a one-day inspection of the Shade-Lohmann Bridge in Creve Coeur, which carries I-474 over the Illinois River, will take place Oct. 15. The inspection will reduce the bridge to one lane in each direction between 8 a.m. and 3:30 p.m.
4
1
1
@IDOTDistrict4
IDOT District 4
4 months
On 10/10, the WB lane of the Cedar St. extension will be closed between Main St. & Edmund St. in East Peoria. Ramps from Main St. to the WB Cedar St. extension also will be closed for a bridge deck pour and will last all day. EB lanes will not be impacted.
0
0
0
@IDOTDistrict4
IDOT District 4
4 months
IDOT announced that resurfacing of Illinois 29 just north of Sparland in Marshall County is underway. The project will reduce Illinois 29 to one lane with traffic controlled by flaggers. Work is expected to be complete later this month, weather permitting.
0
0
0