Astrobotic
@astrobotic
Followers
36K
Following
6K
Media
757
Statuses
4K
Delivering affordable space robotics technology & planetary missions to the lunar surface. Send your science to the Moon!
Pittsburgh, PA
Joined December 2010
We're going to the Moon again - this time with @SpaceX ! Falcon Heavy will carry our Griffin lunar lander to the Moon in late 2023 along with NASA’s water-hunting Volatiles Investigating Polar Exploration Rover (VIPER). 🌙
43
402
3K
(2/2)Peregrine captured this video moments after successful separation from @ulalaunch Vulcan rocket. Counterclockwise from top left center is the DHL MoonBox, Astroscale's Pocari Sweat Lunar Dream Time Capsule, & Peregrine landing leg. Background: our big blue marble, Earth!
51
382
2K
Congratulations to fellow CLPS company, @int_machines! An incredible achievement. We can't wait to join you on the lunar surface in the near future. 🌙.
Your order was delivered… to the Moon! 📦. @Int_Machines' uncrewed lunar lander landed at 6:23pm ET (2323 UTC), bringing NASA science to the Moon's surface. These instruments will prepare us for future human exploration of the Moon under #Artemis.
28
164
2K
(2/3) Peregrine and its payload teams have made a meaningful contribution to our lunar future, and we thank everyone who supported this mission. Courtesy of @ulalaunch, this video was captured from their #Vulcan rocket's payload fairing. Peregrine has flown so Griffin may land.
11
177
2K
Update #17 for Peregrine Mission One: ."Since the Peregrine lunar lander’s anomaly occurred 6 days ago, we have been evaluating how best to safely end the spacecraft’s mission. " .Read more:
109
235
2K
(2/2) Update #13: Payload teams continue to operate & receive power & telemetry. Below is a video from the moment the COLMENA payload team began receiving data confirming it is now the first Mexican instrument to operate in cislunar space. (Video credit: UNAM)
20
146
2K
Congratulations to @isro! Together with the rest of the world, our team is celebrating this success. The Moon is now one step closer to being accessible for everyone and we can’t wait to launch Peregrine Mission One soon, and join the ISRO team on the lunar surface!
18
136
1K
We have a date. 🚀 May 4th, 2023 is the first opportunity for Peregrine Mission One to head to the Moon, launching aboard @ulalaunch Vulcan Centaur!
35
179
1K
Congratulations @Int_Machines on the successful launch today!.
The IM-1 mission Nova-C class lunar lander has launched on SpaceX’s Falcon 9 rocket and successfully commissioned in space by establishing a stable attitude, solar charging, and radio communications contact with the Company’s mission operations center in Houston.
14
54
1K
Our Propulsion & Test team got in the Thanksgiving spirit by roasting a 🦃 over an open flame. using a VTVL rocket engine. 🚀👨🍳 We admit, the recipe needs a little work. Don't try this at home! 😲 #HappyThanksgiving #Turkey #RocketScience
59
154
1K
Peregrine Mission One is officially separated from the launch vehicle! Thanks for the ride, @ulalaunch!.
Separation confirmed! The Peregrine commercial lunar lander, built by @Astrobotic deploys from the #VulcanRocket's Centaur V upper stage and becomes the first mission successfully launched in @NASA's Commercial Lunar Payload Services (CLPS) initiative.
20
129
838
We have a launch date! 🚀 Peregrine is set to journey into space aboard @ULAlaunch’s #VulcanRocket on Dec. 24, 2023. Stay tuned for more information on how to tune in and watch liftoff!.
ULA's #VulcanRocket first certification mission (#Cert1) is planned to launch on Sunday, Dec. 24, from Space Launch Complex-41 at Cape Canaveral Space Force Station, Florida. #CountdowntoVulcan
30
126
675
While integrating our #MoonBoxes with our Peregrine lunar lander (set to land on the Moon in 2021), we stumbled across this #DogeCoin submitted in 2015. Dogecoin is going to the ACTUAL Moon 🌙@DogecoinOnMoon @elonmusk
30
181
618
In mere hours, our Peregrine lunar lander will lift off from Cape Canaveral aboard @ulalaunch Vulcan rocket. Astrobotic CEO, John Thornton, has a message for everyone back home in Pittsburgh! #PM1 #412
42
100
610
Check out our Peregrine lunar lander nestled into the payload fairing in @ulalaunch's #VulcanRocket! 🚀 She's fueled. She's ready for her journey to the Moon: targeting a launch on January 8, 2024 and a lunar landing on February 23, 2024! 🌙.
27
145
606
We’ve been selected by @NASA to develop Extra Large Vertical Solar Array Technology (VSAT-XL) for the Moon. VSAT-XL's impressive size, 34m tall x 12.5m wide🤯, is the largest planned lunar power infrastructure technology to date for the growing energy demands on the Moon.🌕🔌 💡
16
81
588
Peregrine Mission One - launching aboard @ulalaunch #VulcanRocket 🚀 January 8! See you there. #CountdownToVulcan #PeregrineMissionOne
17
76
529
We congratulate the @ispace_inc team on accomplishing a significant number of milestones on their way to today’s landing attempt. We hope everyone recognizes-today is not the day to shy away from pursuing the lunar frontier, but a chance to learn from adversity and push forward.
6
49
475
Peregrine has arrived safely in Florida!The spacecraft was unloaded at @AstrotechSpace facilities to be integrated with the @ULAlaunch’s #VulcanRocket for launch on Dec. 24, 2023. 📸: @ulalaunch
6
77
443
Astrobotic is now soliciting interest for commercial payloads to orbit the Moon or land on the lunar surface onboard Griffin Mission One (GM1). Please contact payload@astrobotic.com to get the conversation started!
31
62
453
The rocket's out of the launch pad, it seems! We've grown with the addition of @mastenspace's impressive portfolio. Read more:
4
69
436
The Peregrine lander #PM1 has already completed Phase One of its lunar journey: assembly of the spacecraft flight model, a rigorous acceptance testing campaign, and encapsulation within the @ulalaunch Vulcan rocket at Cape Canaveral. Phase Two of this mission begins tonight!
9
72
420
Peregrine Mission One has successfully launched to the Moon and established communications with our @DHLGlobal Mission Control Center:
26
64
389
We're collaborating with @BridgestoneUS to develop a new lunar rover tire! This innovative design aims to maximize shock absorption, traction, and to improve energy efficiency — vital for extended lunar missions. Read more:
7
63
401
We're heading to the Moon’s South Pole (again) in 2026! 🌔Today at the Lunar Surface Innovation Consortium (LSIC) we announced our purchase: launch services aboard a #SpaceX #FalconHeavy rocket for our 3rd upcoming lunar lander mission! .
9
81
384
Register to watch our Peregrine lunar lander begin its journey into space aboard @ulalaunch's #VulcanRocket! Sign up to watch live, and for launch updates, so you don't miss a thing: .🌙#PeregrineMissionOne #CountdownToVulcan
14
62
359
"We are just a short time away from our Peregrine spacecraft beginning its journey to the Moon. After years of dedication and hard work, we are so close to having our moonshot, "says John Thornton, Astrobotic CEO. 📸: @ulalaunch
12
52
350
Meet CubeRover, Astrobotic's scalable planetary-class rover designed to revolutionize access to the Moon by employing a standard configuration of scalable sizes from 2U to 24U to perform science missions on the lunar surface at a fraction of the historical cost. 🌕🤖 #CubeRover
7
56
354
Another exciting announcement: Astrobotic has been selected by @NASA for two SBIR Phase II contracts that will assist with the development of power infrastructure on the lunar surface, a key element in establishing long-term human and robotic operations on the Moon.
9
61
336
Following a successful separation from the launch vehicle, Astrobotic Mission Control has established communications with Peregrine Mission One #PM1 and confirmed it is functioning nominally. All Phase 2 objectives are now complete. Next stop, lunar orbit!
6
72
335
Astrobotic Awarded $199.5 Million Contract to Deliver NASA Moon Rover .@NASA #Astrobotic #griffinlander #Moon.
23
71
326
In development at Astrobotic: LunaGrid, a complete power generation and distribution service that survives the lunar night and delivers kilowatts of continuous power to lunar assets for multi-year operations. Launching as early as 2026. #lunagrid #lunarnight #PowerTheMoon
8
55
317
Congrats to the whole @ulalaunch team on a successful launch of the #Cert1 Vulcan rocket! Not a bad way to start off a work week 😁.
10
35
311
With T-14 days until launch, this week we're excited to fill you in on all of the customer payloads headed to the Moon aboard Peregrine Mission One. 🚀🌒 Get ready for #7daysofPeregrinePayloads!.#PM1 #20PayloadsofPeregrine
14
50
288
@elonmusk To the moon. Such distance. Very early. Wow. @DogecoinOnMoon has had this on our manifest since 2015 ✨🚀🌙 we’re headed there at the end of this year!
11
49
301
They say a picture is worth 1,000 words. check out Astrobotic’s ultra-light cable, designed to transmit power between assets on the Moon. Pictured next to one of our all-time favorite astronauts for scale🤯 #LEGO
11
24
283
The @ulalaunch Vulcan Centaur launch vehicle has completed its journey to the launch pad with the Peregrine lander aboard! Not long left before the journey of a lifetime #PM1.
9
26
272
13 years ago we started Astrobotic to make the Moon accessible to the world. Today we are so excited to announce that our Griffin lander will deliver NASA’s VIPER rover to the pole of the Moon in 2023. @NASA #Astrobotic #griffinlander #Moon.
Today we announced that @astrobotic will deliver NASA’s VIPER rover to the Moon in 2023. This @NASAMoon rover and the many payloads we will send to the lunar surface in the next few years are going to help us realize the Moon’s vast scientific potential:
4
33
254
A nice shot of our #Peregrine lunar lander STM - Peregrine is set to land scientific instruments, items from the general public through our #MoonBox program, and more to the Moon in late 2021.
7
50
237
Astrobotic has been selected by @NASA Mars Exploration Program for two studies of commercial services to support lower-cost, higher-frequency missions to Mars. We will examine how commercial services could enable future missions to the Red Planet.
8
37
248
A win for @Firefly_Space is a win for all commercial space! The Astrobots are cheering you on, Fireflies, as your journey unfolds💚🌙.
Follow along with our #GhostRiders on their journey to the Moon! We'll keep you updated on every critical milestone. Check back here for regular mission status updates or on our blog:
7
35
296
Peregrine Mission One: Making Space Accessible to the World and returning us to the Moon once again. #PM1
10
33
237
Just posted a very, very "official" Eviction Notice on the spacecraft. Departure imminent. #astrobotic #peregrinemissionone
11
24
234
@DogeBlocky @JustinScerini @ulalaunch @NASA We get so many messages and comments, it's hard for us to get to it all. We do have a doge coin in the MoonBox program, and posted replies with the photo.
22
80
223