PrathamPrabhu7 Profile Banner
Pratham Prabhu Profile
Pratham Prabhu

@PrathamPrabhu7

Followers
266
Following
21K
Media
2K
Statuses
20K

As children, we praise the hero. As adults, we understand the villain.

Joined September 2020
Don't wanna be here? Send us removal request.
@PrathamPrabhu7
Pratham Prabhu
1 day
Karnataka PWD section, MH border to TG border SH-10, maintained by KRDCL, executed by GVR, RMN Infrastructures & Pratyusha shipping Smooth 2 lane roads with tolls, concession upto 30 years, but like MH section there will be speed breakers & rumblers often to watch out (9/n)
0
0
0
@PrathamPrabhu7
Pratham Prabhu
1 day
That completes the NHAI sections, now moving on to sections by Maharashtra & Karnataka PWD Maharashtra PWD section Murum-Akkalkot section NH-548B, maintained by MSRDC, stretch is decent but with patches of bad roads, speed breakers near towns & turns to prevent accidents (8/n)
1
0
0
@PrathamPrabhu7
Pratham Prabhu
2 days
For the strengthening project for 1st package like I mentioned earlier, is usually done by concessionaire, but since both the concessionaires have left the road construction (IL&FS is bankrupt) now its upto NHAI to bring out tender for maintenance and give it to 3rd party (7/n)
1
0
0
@PrathamPrabhu7
Pratham Prabhu
2 days
That completes the NHAI section, the traffic on Pune-Solapur route has started rising because the Satara-Kagal section of NH-48 is currently undergoing 6 laning & has become slower To be continued... (6/n)
1
0
0
@PrathamPrabhu7
Pratham Prabhu
2 days
Moving onto next road, NH-150, Solapur-Akkalkot built by GR Infraprojects The section being concrete has decent quality, the PQC isnt top notch like Yamuna Expressway but manageable with a few bumps although need to watch out for that MSRDC toll for CVs that feels illegal (5/n)
1
0
0
@PrathamPrabhu7
Pratham Prabhu
2 days
The blackspot rectification in the 2nd package, the contractor AK Shivhare Infrastructure is doing substandard job resulting in slowdown of heavy vehicles on service roads and congestion during evening hours (not to mention the MH-12 & MH-14 drivers discipline) (4/n)
1
0
0
@PrathamPrabhu7
Pratham Prabhu
2 days
Pune-Solapur 2nd package built by IL&FS, the section was subcontracted to GHV India, places where blackspot rectification is going on has resulted in massive crater like potholes due to construction vehicles passing through it To be Continued... (3/n)
1
0
0
@PrathamPrabhu7
Pratham Prabhu
2 days
Roads under NHAI NH-65 Pune-Solapur, NH-150 Solapur-Akkalkot In Pune-Solapur 1st package built by Tata Realty & Infrastructure Limited, 1st subcontract built by IJM, surface quality has started to wear out after a decade compared to 2nd subcontract by Oriental Engineers (2/n)
1
0
0
@PrathamPrabhu7
Pratham Prabhu
2 days
Did Pune to Mantralayam trip over the weekend, and here is the analysis & conditions Starting with the Roads that come under NHAI then with the Roads that come under Karnataka & Maharashtra PWD (1/n)
1
0
1
@PrathamPrabhu7
Pratham Prabhu
11 days
@akshayakrishnaa @Retiredraintree @BallalPrashanth another one, used BMTC Bus dumped Thankfully in the comment section non-migrated folks are supporting private buses As usual migrated folks will justify this over private buses https://t.co/s4LOIU2ya4
2
1
6
@PrathamPrabhu7
Pratham Prabhu
15 days
Meanwhile coastal Karnataka folks: our buses are katkats, mafias that should be closed and should have State Transport Buses Meanwhile the State Transport Buses Government gives: @7071Kt @Retiredraintree @vijeshetty @akshayakrishnaa @BallalPrashanth
@prosperity_life
CK
20 days
KSRTC AC Sleeper, worst journey ever. Bus suspensions totally gone, felt worse than in bullock cart. AC not working. Fire exit door on my seat had a gap; rain & air kept coming in. Please take action! @KSRTC_Journeys @TransportKarnataka #KSRTC #PublicTransport
Tweet media one
Tweet media two
4
0
17
@PrathamPrabhu7
Pratham Prabhu
15 days
Tweet media one
@kohlichronicles
garvi.
26 days
Quote with a random pic otherwise everything will go wrong in September.
0
0
0
@PrathamPrabhu7
Pratham Prabhu
21 days
2000s kids would definitely remember this coming around Ganesh Chaturthi P.S- If the 1st movie came out in today's time it would be stuck in gender related bs by some sensitive folks @kidfrmmountain
Tweet media one
Tweet media two
@PrathamPrabhu7
Pratham Prabhu
1 year
2000s kids would definitely remember this coming around Ganesh Chaturthi P.S- If the 2nd movie came out today it would be stuck in ruckus and would be called "Stereotypical" and "Hinduphobic" @kidfrmmountain
Tweet media one
Tweet media two
0
1
1
@PrathamPrabhu7
Pratham Prabhu
26 days
@Ananth_Krishna_ @IndusFederalist @sangeeth_gvr @IndusFederalist and as usual redditors when they were looking at the spy shots, they all said
0
0
0
@PrathamPrabhu7
Pratham Prabhu
26 days
The full refreshed fleet of Kerala KSRTC @Ananth_Krishna_ @IndusFederalist @sangeeth_gvr From Left to Right AC Seater, FP Link, FP, AC Seater-Cum-Sleeper, SFP, Ordinary/LS, AC-Sleeper & finally the Volvo At the end it's just KB Ganesh reviving his assets
Tweet media one
1
0
2
@PrathamPrabhu7
Pratham Prabhu
26 days
And finally, from paper it's on ground reality @Ananth_Krishna_ @IndusFederalist Today inauguration of the full refreshed fleet of Kerala KSRTC
Tweet media one
@PrathamPrabhu7
Pratham Prabhu
2 years
This will sadly remain on photo, one mistake KSRTC (Swift) did was use B9R/B11R in the era of 9600 @Ananth_Krishna_ @IndusFederalist
Tweet media one
Tweet media two
2
0
9
@PrathamPrabhu7
Pratham Prabhu
1 month
MSRDC realises the issue with Virar-Alibaug and cuts off the 2nd part of the corridor and makes a new greenfield alignment from Chirle to Rewas & finally connecting to Alibaug The Northern half still remains in dispute...
3
0
2
@PrathamPrabhu7
Pratham Prabhu
1 month
However.. they change the alignment somehow, there is some babu with sense knocked in, and they realign the spur and integrate it with the Mumbai-Pune Expressway's Kon Interchange and somehow end it before Kolkhe town
2
1
2
@PrathamPrabhu7
Pratham Prabhu
1 month
Alternative Timeline: Government of Maharashtra realises that Delhi-Mumbai Expressway JNPT spur ends in the middle of nowhere, Since tenders are financially stuck, they hand it over to NHAI, NHAI takes Package-18 from them & executes in war footing However..
1
3
10